Projektek
Lenti
636 kWp
The project will be built on a 1,4 ha area in the outskirts of the city of Lenti, Hungary. The number of mounted power plants is 1 x 498 kVA. The expected completion of the project: 2021 June.
Lenti
A projekt adatai:
-
Project Owner: Euronergy Iota Ltd.
-
Number of power plants: 1 x 498 kVA
-
Location: Lenti 0236/31 parcel number, Hungary
-
Land area: 1,4 ha
-
Annual average irradiation [kWh/m2]: 1,350
-
Nominal DC power: 1 x 636 kWp
-
Solar modules: BYD 340 Wp polycrystalline silicon
-
Inverters: HUAWEI SUN2000-36KTL, HUAWEI SUN2000-33KTL
-
Mounting system: hot-dip galvanized steel, 2-post, ramming system, ’2-module vertical’, 25° fixed angle
-
Transformer station: Siemens Tumetic 22/630
-
Expected Completion: 2021 Q1
-
Power off take: 1 x 15 year 5 month PPA (so called ’METÁR’ permit)